Old McKenzie Pass Closes For Season

mckenzie_pass

The snow is here, and crews will close the Old McKenzie Pass Highway, OR 242, for the winter season.

On the morning of Tuesday, November 1, crews will close the highway from the western gate at OR 126 to the eastern gate just outside of Sisters.

McKenzie Pass is a secondary, scenic highway. Weather, cost and logistics make it impractical to maintain for travel year-round. In the winter, ODOT staff and resources work on main highways to keep them plowed, open and safe.

When the highway is closed, it is closed to all users and is not maintained. Travelers going past locked gates and closure signs could encounter hazards and working equipment on the road, and there are no services or cell coverage.

Every year, McKenzie Pass opens and closes with the seasons. Dates vary depending on road and weather conditions.

McKenzie Pass became a seasonal scenic highway in 1962 with the completion of the Clear Lake-Belknap Springs section of Oregon 126. Even during its time as the main route between the Willamette Valley and Central Oregon, the narrow, twisting roadway and high elevation (5,325 feet) made the highway too difficult to maintain and keep clear during the winter months.

To see what routes are open over the mountains, and to view current road and weather conditions visit TripCheck.com or call 511.

More information on McKenzie Pass, OR 242, can be found on our website.

480941272_29651672671098082_3065510438929561848_n

Veterans Appreciation Day

Join us for a heartfelt day dedicated to honoring and celebrating our veterans at Veterans Appreciation Day! This special event is designed to show gratitude to those who have served while raising funds to support local veterans

cocc_artmaking

Array of Printmaking Art on Display at COCC

A printmaking exhibition by members of Central Oregon’s Studio 6000, titled “Departure, Detour, Divergence,” is showing at Central Oregon Community College’s (COCC) Barber Library Rotunda Gallery from April 1 to June 26, with a reception from 3:30-5:45

deschutes_underwater_steelhead_2

Record Number of Steelhead Migrating

Record numbers of adult steelhead returned to the Pelton Round Butte hydropower project on the Deschutes River during the 2024-2025 run, which ends this month. With more than 950 fish passed upstream of Round Butte Dam, the